How to Conduct a Risk Assessment:
- List all events or situations which entail risk. These could be:
- Strollers or adult walkers blocking emergency exits
- Getting burnt by scalding water when making morning tea
- For each item, decide on the likelihood that this will occur:
- Almost certainly
- Likely
- Possible
- Unlikely
- Rare
- For each item, decide how big would the consequence be if it occurred:
- Extreme
- Major
- Moderate
- Minor
- Insignificant
- Use this matrix to allocate a risk rating of:
- High
- Medium
- Low

- What will you do to mitigate this risk? eg
- Designate the area that must be kept clear to allow easy egress in the case of an emergency
- Re-arrange the kitchen to minimise the distance that hot water needs to be carried
- Reassess the risk (#2, 3 & 4) with each control in place.
- Re-order your list of risks with the highest risk rating (#4) at the top.